Sanitary Sewer Lining

Start Date 08/25/2017
Contractor Visu-Sewer, Inc.
Staff Contact Scott Fish, Engineering Technician (847-639-0003)
Sanitary Sewer Lining will take place in late August/early September. The contractors will be cleaning and televising the sewer lines. The Village televises equipment to identify areas in need of repair due to age related failures. During the lining process, the contractor will need to access manholes located in front of homes. It is possible during the installation of the liner, residents may detect a odor in the area. The odor should dissipate within a few hours. 

Cleaning and videotaping of the sanitary sewer lines will take place Friday 08/25/2017 and Monday 08/28/2017. The lining of the sanitary sewer is TBA.
Cary 2017 Sanitary Sewer Lining
Description From To
Alma Terrace N Sandra Lane East of Silver Lake Rd
Elden Drive Alma Terrace Weber Court
Ann Street Elden Drive East End